For the web I've bought some fibre gear, while many people would be happy on wifi, I'm 30m far from the house. It's still view, however signal will be affected with uploads/downloads being 1/5th of cabled speed. Ideally I want the fastest upload/dl speeds for business and trading, so dropped fibre cable television (20 - ebay) into the trench, together with CAT6 as a backup, that enters into a switch at this end and has a fiber to ethernet converter at house end.
Noggings of wood to left of the above image are for the breaker box. Wires for an LED strip 2/3rds up the front wall and the room pendant light in the centre. Socket places were a double in each back corner, two at each front. One next to door to be used for outside things, one under window for radiators, on a different spur.
Breathable membrane I was worried it would ping and ting in the rain, but with the insulation and other layers being all straight attached, no spaces between, any little noise there is is dampened to near silence. Beginning at the bottom, overlapping at the top by 60cm, with a silicon bead or two between and along side edges See that overlap - no rain sneaking back up there! It was in roof and siding that I initially got to fulfill the steel mill, and get a feel for the various sizes of discs and pressure to use when grinding - Blokhut Van Boomstammen.
Thicker ones took a bit more 'pushing' and created more mess. Needless to state, be mindful on the roofing. I managed to get the sheets up myself, however a work buddy would be beneficial here. Blokhut Douglas 3x3. Likewise don't sit on the edges and overlaps. Easy to forget as soon as covered Siding where the elec and web show up A little more siding Insulation Filling out the walls Wider angle And the other method And the exterior.
It is really difficult to discover a good deal on large quantities of more pricey insulation, however it is extremely easy to find a bargain on fibreglass - Blokhut 2x3. Among my issues was acoustic insulation, wishing to see films and listen to music at high volumes without disturbing neighbours, and fibreglass also fits the costs here, deadening deep low noises with ease.
Do wear a mask due to the fact that it actually does stop the coughing. Or spend more of your spending plan on the foam or Rockwool type insulation. For the roofing insulation, when it wasn't quite pressure-fitting into place, I used long screws set at angles to keep it in place. It wasn't perfect, however it worked.
As soon as you put a solid hundred percent humidity evidence barrier in place, the danger is that you can develop problems with condensation forming on the warm side of the barrier. This can lead to mould and damage. The benefit is that no cold air can blow in and all of your good warm air remain in.
Having actually been sent out the wrong size from a local provider, I was required to purchase another roll and went to search for the most economical on e, Bay. The one I wound up purchasing was 30 for 50m but was just single sided and was extremely thin compared to the greater quality one I had first bought, which was reinforced double sided and extremely thick.
Also check out these great articles: https://www.wikidata.org/wiki/Q18756633 en https://nl.wikipedia.org/wiki/Blokhut.
Tips Leave long enough flaps of vapour barrier over the base edge. I believed I had, but by the time I 'd folded them back under the wall frames there was insufficient for a consistent seal. The frame sits tight, with plasterboard/plaster/skirting in front, but I 'd have preferred to have been able to tape over that too for completeness.
It's so hard to get the boards lined up by hand with all the cutting and minor mis-measurements on a construct like this. Utilize the lighter ceiling boards, don't try to cut the big 12mm ones like I did. They weigh 22kg each and when they begin to move out of place from your hands or back hard times.
Going over gaps is a PITA. More ideas in the plastering section below. Got there in the end, then jointed the gaps Missed a trick with studs on edges, caused problems with plasterboarding and possibly going through electrics as I fired nails in at angles into wood. Thankfully electrical contractor put cable televisions high enough to be clear.
The plasterer I talked to quoted for at least 3 days labour plus costs and wasn't offered until after Christmas, which was three months away. Everyone was attempting to get their plastering done prior to Christmas, he stated. I went back to my Plan B which I 'd seen at the Do it yourself shop Wickes; tubs of premixed plaster.
I dropped by and selected up 5 tubs of Knauf Pro-Roll - Answers Shown Here. Outcome of 3-4 days of plastering. You can see the thicker locations still drying. Took a couple of days to go off all over. I used the Lite variation, at a loss tubs. It cost 25 per tub. In the end I required three more to contribute to this, given the size of the room, so ended up spending 200 on plaster.
The opposite We have more trowell marks on walls in our house done by an expert plasterer in lots of places. Odd thing is, I acknowledge the kinds of marks - edge of trowel, tense row of lines all things I attempted to settle that our pro in our house didn't! I still need to fill and sand certain locations, but I have actually been operating in the office for over a month now and have been concentrating on home furnishings and fittings since.
More from Blokhut Permanente Bewoning, Blokhut 3x6
Table of Contents
Latest Posts
Blokhut 6x5
Blokhut Permanente Bewoning
Blokhut 2x2
All Categories
Navigation
Latest Posts
Blokhut 6x5
Blokhut Permanente Bewoning
Blokhut 2x2